Contact Us
- Phone: (314) 524-3313
- Fax:
(314) 264-2072 - Staff Directory
In this Department
Topics of Interest
Comprehensive Plan
2009 Comprehensive Plan is available on-line
The 2009 Comprehensive Plan was adopted by the Planning and Zoning Commission and an electronic version may be obtained by following the link below.
2009 Comprehensive Plan - Follow this link to view an electronic version of the Plan (This file may take a few minutes to download).
Comprehensive Plan Updates
The city anticipates updates to the comprehensive plan in 2023. Contact Elliott Liebson at 314-400-3705 or eliebson@ci.berkeley.mo.us for more details.
In addition to the Comprehensive Plan, the Community Development Department has begun to undertake more detailed level surveys and is currently studying the Airport Road Corridor and the Frost Avenue Corridor for consideration of potential future projects such as streetscape enhancements and other projects to enhance these vital corridors within the community. The Department has developed several graphics that represent analysis of existing conditions and conceptual drawings that look to address the needs of both corridors.
Follow the links provided below to access these conceptual drawings.
- Airport Road Existing Conditions
- Airport Road Planning Considerations
- Frost Avenue Existing Conditions
- Frost Avenue Planning Considerations
- Berkeley Station Concept Plan
- Berkeley Zoning Map 2011
- St. Louis Regional Sustainable Communities Meeting
For more information regarding the 2009 Comprehensive Plan or to become involved please contact the Department of Community Development.